Several copies are in the packet. One of them rides with the pan. You pull that copy free now, tuck the rest of the packet into the bench file slot to your left, and run a finger along the stamped part number at the top right to confirm it matches the stamping on the pan’s lower flange.
How you mark active work steps on this sheet
You use only the blue grease pencil clipped to your apron to mark this sheet, no permanent marker or ballpoint pen, so you can adjust markings if work steps are revised mid-job by engineering or your shift lead. You circle the current active step in a thick, clear blue line that spans the full width of the step text, so anyone picking up the sheet can immediately see where you left off. You add a small blue dot next to any sub-step that requires specialized tooling you don’t keep at your primary bench, so you can pull those tools from the shared storage rack before you start the step, rather than pausing work mid-process to track them down. You cross out completed steps with a single thin line, never scribble over the text, so shift leads or quality techs can retrace your work if a discrepancy arises later. Illustrative example: If you’re working step 7, which calls for 0.002 inch runout on the pan’s mounting boss, you add a tiny “7” in the margin of the sheet to match the label on your dial indicator stand so you don’t mix up readings between concurrent jobs running at your bench.

Edge notches that flag pending quality checks
Three pre-punched ¼-inch notches run along the right edge of this sheet, each aligned with a required quality check that must be completed before you move to the next phase of pan fabrication. The top notch corresponds to the post-cut dimensional check, the middle notch to the post-forming stress relief check, and the bottom notch to the post-coating adhesion check. You tear the relevant notch off only after a certified quality tech signs the corresponding signature line at the bottom of the sheet, no work proceeds past a check point if the matching notch is still intact. You align the torn edge of the notch with the printed reference line next to each check entry to make the status even clearer at a glance, and you discard the torn notch bits in the bench waste bin rather than leaving them on your work surface where they can mix with metal shavings. If you pick up the sheet and notice a notch is missing but no signature appears on the corresponding line, you flag the issue with your shift lead immediately before starting any additional work on the pan.
Measurement cross-references for pan flange alignment
This table maps each flange location on the pan to its required tolerance, the correct verification tool, and the cue that confirms the measurement meets spec, so you don’t have to leave your bench to flip through the master engineering binder mid-work. You log each final measurement in the blank line next to the corresponding flange entry on the sheet immediately after you take it, so you have a running record of all readings without switching to a separate log document. If any reading falls outside the stated tolerance, you flag it with a red sticky note attached to the top left corner of the sheet before notifying your shift lead, so anyone handling the sheet sees the flag before they touch the part.
| Flange Location | Required Tolerance | Verification Tool | Acceptance Cue |
|---|---|---|---|
| Front mounting flange (4 holes) | ±0.003 inch flatness | 12-inch straight edge + feeler gauge | No light visible between straight edge and flange when feeler gauge thinner than tolerance is inserted |
| Left side fluid port flange | ±0.001 inch runout | Dial indicator mounted to magnetic base | Indicator needle moves no more than tolerance value across full 360 degree rotation of port |
| Rear drain plug flange | ±0.005 inch thread pitch alignment | Go/no-go thread gauge | Go gauge screws fully into threads with no binding, no-go gauge stops within 1 full rotation |
| Right side bracket mounting flange | ±0.002 inch parallelism to front flange | Height gauge set to front flange baseline | Height readings across bracket flange vary no more than tolerance value |
You double check each measurement against the table a second time before you log it, to catch any misreads that could lead to rework later in the fabrication process. You never estimate measurements or fill in log lines from memory, you take each reading in the moment and record it right away.
Temporary storage spots for this sheet between work cycles
You never leave this sheet sitting on an open work surface where it can get splashed with cutting fluid, covered in metal shavings, or knocked onto the floor where it can get lost or damaged. Only two approved storage spots exist for this sheet when you’re not actively working on the pan: the clear plastic sleeve mounted to the front of the pan’s holding cart, or the locked slot at Traveler Desk if you’re leaving the pan in the queue for more than one shift. When you use the cart sleeve, you make sure the sheet is fully inserted so no edges stick out that can tear, smudge, or catch on other equipment as the cart moves through the shop. You never tuck the sheet into the pan itself, because residual oil from the stamping process can smudge the pencil markings and make them unreadable for the next tech working on the job, and loose sheets inside the pan can fall out during transport without anyone noticing. If you notice any damage to the sheet while you’re moving it to storage, you notify your shift lead immediately so a new copy can be printed and all existing markings can be transferred over before the next work cycle.
Your pre-work review of this sheet before you resume the job
When you pick this sheet up to start work on the pan again, you first run a finger along the right edge to check which notches are torn out, so you immediately know which quality checks are already complete and which you still need to schedule. Next, you cross-reference the circled active step with the current state of the pan to make sure no work was done on the part while you were away that wasn’t marked on the sheet, so you don’t repeat work or miss a required step. You then scan all logged measurements to confirm they fall within the stated tolerances in the cross-reference table, so you don’t build on work that doesn’t align with engineering specs. You also scan the full sheet for any sticky notes or handwritten annotations from shift leads, quality techs, or engineering staff, so you address any special instructions or revisions before you start running tools on the pan. If any markings are smudged, torn, or unreadable, you request a new copy from your shift lead before you proceed, rather than guessing at what the original markings said. Once you confirm all details are correct and you understand the current state of the job, you circle the next active step if you’re moving past the previously marked one, and begin work as outlined. You keep the sheet within arm’s reach for the full work cycle, so you can reference it as needed and update markings immediately as you complete each step.
