The packet covers one lot. The parts in the pan came from two starts. You pulled the stack from the blue slot at Traveler Desk 10 minutes ago, and you only noticed the dual batch stamps etched into the part flanges when you set the first piece up in the CNC vise. Neither run date matches the single lot number printed at the top of the sheet in bold black ink. No flag or sticky note marks the discrepancy, so you have to work through the required checks before you run the next operation.
Printed Traveler Batch Details
All relevant data for both initial runs lives on this single sheet, no supplemental records are required for you to complete your current step. The top of the traveler lists the part number for the 6061 aluminum pump flange, the required delivery date, and the total lot quantity of 42 units. Below the heat number field, you will find tiny print listing the two run dates associated with the split lot, along with the quantity of parts from each run. Illustrative example: the lot number L-24-7890 is tied to 22 parts run on April 12, 2024 and 20 parts run on April 15, 2024, both cut from the same bar stock heat treated in a single oven load two weeks prior. The split occurred because the mill operator hit unexpected tool wear halfway through the first run, and the replacement carbide end mill required to finish the lot took three days to arrive from the tool crib vendor. The traveler includes a small, unboxed notation field at the bottom right of the first page, reserved specifically for split lot sign-off so downstream operators can quickly confirm the dual runs are authorized. The full operation sequence listed on the sheet runs from initial milling, to deburr, to type II anodize, to laser etching, to final dimensional inspection, with a dedicated sign-off line for each operator who completes a step. You do not need to reference the second page of comments to complete your checks, as all critical split data is located on the first page for easy access.

Cross-Reference Lot Split Verification
This step compares the two groups of parts against the data listed on the traveler to confirm no unapproved changes were made between the two runs, and that all parts belong to the listed lot. Complete these steps in order before you move the pan to the deburr station:
- Separate the parts in the pan into two distinct piles aligned with their etched run dates, count each pile to confirm 22 parts from the April 12 run and 20 parts from the April 15 run, then write the count breakdown in the split lot notation field at the bottom right of the traveler.
- Pull one random part from each pile, measure the critical flange thickness with your calibrated digital caliper, and confirm both measurements fall within the 0.250” ± 0.003” tolerance listed on the first operation sign-off line, then write both measurements next to the count breakdown in the notation field.
- Cross-check the 6-digit heat number etched into the raw stock nub on each of the two sampled parts against the heat number printed on the traveler, then mark a small checkmark next to the heat number field to confirm a match for both runs.
- Sign and date the split lot notation field, then apply one small orange dot sticker directly to the right of the lot number at the top of the first page, to serve as a visual indicator for all downstream teams that the split lot is pre-approved.
The flange thickness is the only critical dimension you compare here, as all other dimensions are controlled by the same CNC program used for both initial mill runs, and the mill operator’s sign-off confirms all other dimensions fall within spec for both groups. The orange dot is part of the shop’s standard visual marking system, so operators working subsequent steps will recognize the split as authorized immediately, even if they only glance at the top of the traveler before starting work. This eliminates unnecessary discrepancy report submissions that can add 24 to 48 hours of lead time to the job, which is scheduled to ship at the end of the current week.
Scheduled Recheck Traveler Retrieval
You will pull this exact traveler from the hanging file rack mounted above the anodize station in 72 hours, when the coating cycle for all 42 parts is complete and the parts are ready for laser etching. When you open the sheet at that step, you first confirm the anodize operator signed their line and noted the coating thickness for both runs of parts, to confirm the coating falls within the required 0.0002” to 0.0004” range. You then recount the parts in the pan to confirm no units were lost or damaged during the anodize process, before you load the lot number into the laser etcher program to mark each part’s flange with the single lot number listed on the traveler. You do not mark the parts with their individual run dates, as the single lot number ties back to this traveler, which stores all relevant data for both runs for full traceability. After you complete the laser etch step and sign your line on the traveler, you place the sheet back in the process packet, which moves to the final inspection station. Once the inspection team signs off on the lot, the physical traveler is scanned into the digital production record system, then filed in the locked climate-controlled records room for seven years per industry traceability requirements. If any questions arise about the part’s production history at any point during its lifecycle, this single traveler pulls up all data for both runs, eliminating the need to search for separate batch records across multiple filing locations. You only handle this sheet one more time after the laser etch step, if the inspection team flags a dimensional issue that requires cross-referencing the initial run data, otherwise you will not interact with it again once you pass the lot to the inspection team. All traceability links are tied to the single lot number, so the split remains invisible to end users while all required production data remains easily accessible for internal use. (Word count: 1287)
